Woltman THW4019D - Vroom Funderingstechnieken
Img 07

Woltman THW4019D

The Woltman THW4019D pile driving rig was specially developed for installing displacing concrete screw piles of lengths up to approx. 19 m.

Folders were developed for projects that require a short set-up time and/or have limited available set-up space. These pile driving machines are transported in almost complete state, including the equipment for driving or drilling piles.

Folders are generally used for all usual types of pile system: from traditional pre-fab concrete piles to modern in-situ displacing or earth-removing pile systems.

Some machines are suitable for work ‘from the side'.

Specifications, Woltman THW4019D


Weight class

In operation approx. 50 - 55 t.

Suitability for working with piles at an angle

Tilting backward suitable, tilting forward less suitable.

Leader length

Max. 24 m.

Max. drilling power

Up to 15 tonm.

Maximum pile length
Cast in-situ piles, up to approx. 19 m.