Preparing the pile driver - Vroom Funderingstechnieken
Img 07
November 13, 2018

Preparing the pile driver

This sort of equipment can't be transported just like that; it needs to be partially dismantled. The result is that the component parts are suitable for transport by road. The parts are often attached to each other with bolt fastenings when the plant is in use.
Default img 0125

The full length of the equipment depends on the length of the piles and on whether or not a noise-reducing jacket needs to be used, in which case the machine needs surplus length. The leader length is adjusted to match by using and bolting on one or more leader sections.