Start homes Schepenlaan stage 2 - Vroom Funderingstechnieken
Img 07
November 15, 2014

Start homes Schepenlaan stage 2

In collaboration with Apple Beton and Heddes Bouw & Ontwikkeling, a start has been made with the piling activities for the second stage of the Schepenlaan project in Amsterdam. This is a sequence to the successful collaboration for the construction of homes in stage 1.

Stage 2 includes 32 homes for sale on Schepenlaan in Amsterdam. In addition to piling, prefab foundation beams that have been produced by our partner Apple Beton are being mounted. The piling activities include 4300 m of prefab piles. These piles have a square size of 220 and 250 mm and a maximum length up to 20 m.


Medium spr website 165 185 6 5 19
Can we help you with your project?

Contact Sandro Pronk. Dial +31(0)299 409 507 or send us an e-mail.