Vroom strikes twice - Vroom Funderingstechnieken
Img 07
September 24, 2012

Vroom strikes twice

For drilling displacing and cast-in-situ VGS grout-injection piles, Vroom has once more set a length record. Piles until 44,2 m have been produced.

Previously, during the expansion of a tank depot in the Rotterdam harbor, Vroom already set a length record of 47,1 m for the production of cast-in-situ and displacing HBF cast-in-situ vibro piles.