Windmill park Nieuwe-Tonge - Vroom Funderingstechnieken
Img 07
June 04, 2015

Windmill park Nieuwe-Tonge

On Goeree-Overflakkee in Zuid-Holland, 144 vibro piles are currently being realized for four windmills near Nieuwe-Tonge. Client GMB Civiel BV has opted for displacing vibro piles.
Default img 2608

Each mill will be founded on 36 piles with a diameter of 608 mm and a length of 25 m. As windmills require a lot of bearing capacity, the piles will be realized in a fair slant position (4:1). The engine will be set up for a short period of time in order to place the piles in a forward position. The slant piles will be adjusted into the right position with an inclinometer that has been fixed onto the engine’s head: the leader. From inside the engine’s cabin, the machinist can read the inclinometer. The slant position will be checked with a spirit level of at least 0,6 m and a template that will be placed onto the pile. The project will take 3,5 weeks.


Medium paul bochem a
Can we help you with your project?

Contact Paul Bochem. Dial +31(0)299 409 541 or send us an e-mail.