Campus A58 comprises 10 units, varying in floor space from 9540 to 13,000 m2 of warehousing, with 1360 to 1650 m2 of office space on the mezzanine floor. In total, c. 115,000 m2 of warehousing and c. 15,000 m2 of office space.
The units are spread over 2 buildings. There are 157 docks and 10 GLDs. Standard maximum clearance is 12.5 m. The project as a whole will be completed in a sustainable way, in line with the standards for the BREEAM ‘Very Good’ rating.
The Campus A58 site is immediately adjacent to the A58 motorway, so it is easy to reach and leave, using exits 22 and 23. Access to the A17 motorway (Brussels – Antwerp – Amsterdam) has been simplified with the completion of the by-pass that links the two motorways, so lorries no longer have to pass through or go into the town itself.