The distribution centre will have an operations hall, offices and outdoor area. The new distribution centre will be used as a bonded warehouse for goods subject to duty, and food products. This expansion will create at least 50 jobs.
Steel structure
The building will have 21 docks, and will be built using a steel structure with sandwich panels and, around the edges, a concrete base board. The design was made by Hercuton; what is immediately noticeable is that the distribution centre is situated in the centre of the design, with offices either side. The building is scheduled for completion on 1 March, next year.