The logistic building has, in addition to five distribution centers, a mezzanine and an office space. All rooms have been equipped with an ESFR sprinkler system (central fire water supply) so that they are suitable for the storage of consumer goods.
Piling activities
The piling activities include the realization of 568 cast-in-situ vibro piles measuring a total length of 15,386 m. Piles with diameters of 323, 356 and 457 mm have been produced with a Hitachi KH-300GLS rig. The longest pile is 31,5 m.
Completion
This warehouse’s completion has been scheduled for September of this year. We aim to complete the whole logistic campus (suitable for the storage of consumer goods) by the end of this year.