For the greater part, the vibro piles will be realized in a slant position of 4:1. For the production process, we will use an additional crane. The project must be completed within a short period of time so therefore we are working long days from 7AM until 7PM. We are producing a total number of 143 vibro piles and 13 steel tubular piles.
Stolthaven terminals
143 vibro piles13 steel tubular piles
For a loading station and bridge in the harbor of Stolt, we have started to produce vibro and steel tubular piles. The execution process will be carried out on a chemical site as the work will be done according to the client’s procedures.