House building Polderweijde stage 5 - Vroom Funderingstechnieken
Img 07

House building Polderweijde stage 5

At temperatures measuring -12° C, early February of 2012 the first pile for 12 homes as part of the Polderweijde stage 5 projects was driven.

The 12 homes distinguish themselves by extra focus on comfortable living and durability. This manifests itself through the default application of underfloor heating systems and solar boilers for warm tap water. In addition, high-quality isolation systems are applied resulting into considerably lower gas bills.

FACTS & NUMBERS

Project 48224
Project Polderweijde stage 5

12 duplex homes

Cliënt Mulder Obdam Ontwikkeling B.V.
Location Obdam

Architect Boparai Associates bv te Oostzaan

Constructor Zeeman

Delivery expected for the 4th quarter of 2012

Foundation activities

152 prefab CFA piles

Square 250 x 250 mm

Length 14,5 – 17 m