Foundation repair - Vroom Funderingstechnieken
Img 07

Foundation repair

Initially, in Koog aan de Zaan all segment piles would be driven into the tube. As a result of too much vibration during this process, the additional piles have been produced vibration-free in drilled segment piles with grout injection. The project has been executed for our colleague P. van ‘t Wout Funderingstechnieken.

FACTS & NUMBERS

Project 68064
Project Vervangende nieuwbouw
Location Jan de Witstraat 79, Koog aan de Zaan
Cliënt P. van ’t Wout Funderingstechnieken
Contractor De Nijs

Pile position

Number of piles 6
Length 19,25 m
Diameter 168 mm
Segment length 4 m

Vroom team

Machinist Ruud van de Giessen and Erwin Spruijt.