Tank pit, Plastic to Oil Facility
Energy, Petrochemicals

Tank pit, Plastic to Oil Facility

Close to the NUON facility we are currently installing vibrated piles for a tank pit. We have to make sure there are proper foundations by driving no fewer than 800 piles into the ground. On the photos you can see our new JCB shovel loader.
Expansion Maastank tanks
Petrochemicals

Expansion Maastank tanks

For a new tank in the Botlek, Vroom is applying 600 vibro piles. With two rigs, the piles are being applied next to the current tanks. We are applying cast-in-situ displacing vibro piles.
Petrochemic recovery plant
Petrochemicals

Petrochemic recovery plant

In Rotterdam-Pernis, Vroom is applying the foundation piles for a recovery plant. This happens amidst the current plant. Displacing vibro piles are being applied so that only a few materials have to be transported on the construction site.
Stolthaven terminals
Petrochemicals

Stolthaven terminals

For a loading station and bridge in the harbor of Stolt, we have started to produce vibro and steel tubular piles. The execution process will be carried out on a chemical site as the work will be done according to the client’s procedures.