Close to the NUON facility we are currently installing vibrated piles for a tank pit. We have to make sure there are proper foundations by driving no fewer than 800 piles into the ground. On the photos you can see our new JCB shovel loader.
Petrochemicals
Expansion Maastank tanks
For a new tank in the Botlek, Vroom is applying 600 vibro piles. With two rigs, the piles are being applied next to the current tanks. We are applying cast-in-situ displacing vibro piles.
Petrochemicals
Petrochemic recovery plant
In Rotterdam-Pernis, Vroom is applying the foundation piles for a recovery plant. This happens amidst the current plant. Displacing vibro piles are being applied so that only a few materials have to be transported on the construction site.
Petrochemicals
Stolthaven terminals
For a loading station and bridge in the harbor of Stolt, we have started to produce vibro and steel tubular piles. The execution process will be carried out on a chemical site as the work will be done according to the client’s procedures.