For this project we are supplying and driving precast concrete piles in multiple phases. We also install precast foundation elements. These elements enable more efficient use of materials and help reduce transport movements, resulting in lower CO₂ emissions.
The precast foundation is ideally suited to these flexible homes, as it is designed to be demountable. When relocated, the elements can be easily disassembled and reused at a new location. Thanks to the close collaboration with Heddes, the construction process is exceptionally swift: on average the foundation elements are installed just a few days after the piles have been driven. This approach guarantees a tight programme and a robust base for the flex housing units.