20-10-2023

Start young, stay wise

Materieelbeheer Vroom is a sought-after field for our prospective employees.

This time, 17 enthusiastic students from OBS Middelie visited our yard in Middelie. The eager group fired questions at our colleagues. After a brief presentation in the cafeteria, the students, along with their teachers and our guides, took a tour of our yard. “It was a very enjoyable group of children who asked surprising and interesting questions. The kids were wide-eyed, and we ran out of time,” said Erwin Spruijt, equipment project manager.

Asset management

Within Vroom Funderingstechnieken, Materieelbeheer Vroom primarily deals with the transportation, servicing, repair and engineering of foundation machines and accessories.

Start young, stay wise
Start young, stay wise
Start young, stay wise
Start young, stay wise
Start young, stay wise
Start young, stay wise

Share article:

More posts

BAUMA 2025: inspiration, innovation and connection
18-04-2025

BAUMA 2025: inspiration, innovation and connection

On Friday 11 April, an enthusiastic group of colleagues from Vroom travelled together to Munich to attend BAUMA, the leading trade fair for construction and foundation technology. After arriving early on Saturday morning, we kicked off the day with a hearty breakfast, after which we headed to the exhibition full […]
Hitachi CX900-GLS restored to peak condition
08-04-2025

Hitachi CX900-GLS restored to peak condition

After nearly eleven months of work in the Van den Heuvel workshop in Werkendam, it’s back. And better than ever. Commissioned by Vroom Funderingstechnieken, Van den Heuvel carried out a thorough overhaul and engine replacement on the Hitachi CX900-GLS. The result: an impressive foundation rig, fully prepared for a new […]
Certification of pile systems DPA and DPA-PLUS
21-03-2025

Certification of pile systems DPA and DPA-PLUS

Vroom Funderingstechnieken and Van ‘t Hek have jointly certified the pile systems DPA and DPA-PLUS with a self-declaration in accordance with NPR 7201. This process took over two years and involved load tests in which test piles, equipped with extensometers, were loaded to failure. In addition, an expert committee appointed […]
To top