22-04-2022

This is what our customers think

We constantly measure the satisfaction of our customers. We do this with a weekly questionnaire that we send to all customers for which we have completed our work.

The question, ‘Are you satisfied with the performance of our company?’ was answered positively in no less than 76% of cases, 17% gave a neutral answer and 7% said they were not (or not entirely) satisfied.

The questionnaire also asked for extra information on the answer given, and whether the respondent could indicate where improvements could be made. We analysed all the answers, discussed them in-house and used them to help optimise our services. Shown below are a number of quotes from our customers, taken from polls over the past six months.

Quotes

Verdoorn, De Vries en Verburg B.V.
“A structure is something you build together, and that means finding solutions together, too.”

Kees Booij, RvB Infra Harderwijk B.V.
“Everything went according to plan. Communication was good. Our client was also satisfied with the work on site.”

M. van der Veer, Bouwbedrijf M. van der Veer
“Short lead time from the start of project to the actual work, great people to work with, and they left behind a pristine building site.”

Frank Stavenuiter, Loos Betonvloeren
“Not the average building pit, yet they did all they could to get the job done.”

Lennard Vliet, Vink Bouw B.V. 
The work went well, but in the 2nd block there were some discrepancies in pile positioning.”

Cees Zwets, Zwets Industrievloeren B.V.
“Everything went to schedule; the whole process from the offer to completion of the work was carried out very professionally and we got your report in good time.”

G. de Groot, Bouwbedrijf Niersman B.V.
“Went well. Good supervision of the work. A world of difference compared with our previous contractor.”

Iwan van Zoomeren,
“There’s only one word for them: stars.”

Klaas de Boer, De Boer Bouw & Ontwikkeling B.V.
“Went well. The process as a whole was very formal, with a lot of different people for such a small-scale project.”

Robbie van de Sande, Bloxbouw
“Everything as per agreements and decent people on site, who were good to work with.”

Martin, U-Build
“From the offer to the work itself, including negotiations on the foundations, everything went well. Bring on the next project!”

Peter van Mil, Aannemingsbedrijf van Mil
“Nice equipment, and the piles were put in professionally. One point that could be improved on is studying the drawings more carefully at the offer stage. As several piles were planned too close to adjacent structures, steel piles had to be used instead. That was a major contract variation which hiked the price up, leading to tension with the client.

Roelof van der Haar, Dons en Troost Staphorst
“Pleasant negotiations.”

Thomas Mangelaars, B.B. Vrolijk
“Tidy work.”

Danny van Overloop, H4A
“Went well and ran to schedule.”

This is what our customers think
This is what our customers think

Share article:

More posts

BAUMA 2025: inspiration, innovation and connection
18-04-2025

BAUMA 2025: inspiration, innovation and connection

On Friday 11 April, an enthusiastic group of colleagues from Vroom travelled together to Munich to attend BAUMA, the leading trade fair for construction and foundation technology. After arriving early on Saturday morning, we kicked off the day with a hearty breakfast, after which we headed to the exhibition full […]
Hitachi CX900-GLS restored to peak condition
08-04-2025

Hitachi CX900-GLS restored to peak condition

After nearly eleven months of work in the Van den Heuvel workshop in Werkendam, it’s back. And better than ever. Commissioned by Vroom Funderingstechnieken, Van den Heuvel carried out a thorough overhaul and engine replacement on the Hitachi CX900-GLS. The result: an impressive foundation rig, fully prepared for a new […]
Certification of pile systems DPA and DPA-PLUS
21-03-2025

Certification of pile systems DPA and DPA-PLUS

Vroom Funderingstechnieken and Van ‘t Hek have jointly certified the pile systems DPA and DPA-PLUS with a self-declaration in accordance with NPR 7201. This process took over two years and involved load tests in which test piles, equipped with extensometers, were loaded to failure. In addition, an expert committee appointed […]
To top