We are using four rigs in order to insert over 2,100 piles. We are processing four different pile diameters and lengths. The piles are being realized on-site so that we require fewer heavy transport actions to the site. The piles are being made by inserting a temporary framework (steel pipe) into the ground and placing concrete and a reinforcement basket into it. Subsequently, we pull the framework out to use it again.
A9 tunnel
We are working quite hard alongside the A9 freeway near Amsterdam Zuid-Oost. Under the authority of building company group IXAS and using 4 lanes simultaneously, we are working on the capacity for a huge tunnel with additional lanes and reversible lanes.