For this project, Vroom became involved in the execution phase at relatively short notice. Due to the limited preparation time, the original design using precast concrete piles was reviewed and optimized into a foundation solution based on vibro piles with a noise-reducing casing. This adjustment made it possible to better align with the construction schedule while maintaining the required foundation quality.
The vibro piles with a noise-reducing casing were then adopted as the basis for construction. Due to the surrounding buildings and the requirements regarding noise and vibration control, part of the foundation was executed using screwed piles. This combination of techniques enabled the foundation to be installed efficiently and with consideration for the surrounding environment, while meeting the project’s and site’s constraints.