During the preparatory phase, we jointly selected a DPA piling system together with Beemsterbouwers. This foundation method was well suited to both the technical requirements and the specific conditions of the construction site. The available space within the excavation was limited, making the positioning of equipment particularly challenging. This required thorough preparation and a carefully considered, safe execution strategy.
Despite these confined conditions, we successfully positioned our piling rig in a stable manner and carried out the works in a controlled and efficient way. In close cooperation with Beemsterbouwers, we developed a practical solution to achieve this. By installing additional steel road plates alongside the crane mats, we created sufficient bearing capacity and working space for our equipment. Thanks to this collaborative approach, the works could be executed safely and efficiently.
This project is an excellent example of how collaboration, craftsmanship and a solution-oriented mindset lead to a successful outcome, even under demanding circumstances.