21-05-2024

Vroom headquarters made more sustainable

We are delighted to share that Vroom Funderingstechnieken continues to take significant steps towards sustainability. This time, we focus on our headquarters in Oosthuizen.

For Vroom, investing in and keeping up with developments regarding ‘clean’ engines and reducing (diesel) emissions is nothing new. Since the implementation of the TIER (US) and EU Stage regulations for diesel engines, these standards have always been adhered to. Over the years, significant investments have been made in acquiring new equipment that always meets the latest technological standards. But we do not only invest in the sustainability of our equipment; we also invest in a more sustainable world on other fronts.

[text continues below the photos]

Vroom headquarters made more sustainable
Vroom headquarters made more sustainable
Vroom headquarters made more sustainable

Solar panels

Our headquarters is now equipped with solar panels, allowing us to generate our own green energy, resulting in a better ecological footprint.

High-performance glass

We have replaced all our windows with new high-performance glass. This means better insulation, reduced energy consumption and a more comfortable working environment for our team.

Roof insulation

Additionally, we have replaced the roof insulation, contributing to a significant improvement in the energy efficiency of our building. This ensures better heat retention and further reduction in our energy consumption.

High-efficiency++ boilers

We have also replaced our central heating system with high-efficiency++ boilers. This greatly enhances the efficiency of our heating and reduces our gas consumption.

Clean and fresh

And as if that wasn’t enough, we have had our headquarters thoroughly cleaned. The result? A fresh, clean and sparkling office where we enjoy working!

Share article:

More posts

Holidays
07-12-2024

Holidays

Vroom Funderingstechnieken and Vroom Betonbouw will be closed from 23 December 2024 to 7 January 2025. This period of rest and recovery is an important moment for the team to enjoy the holidays with family and friends. Continuous development and training After the holidays, Vroom will begin the annual collective […]
This is what our clients think
05-12-2024

This is what our clients think

Since 2019, we have been systematically and continuously measuring our clients’ satisfaction. We do this through a weekly survey sent to all clients whose projects have recently been completed. We ask respondents to rate us on the following aspects: How would you rate us in general? How did you experience […]
Visit InfraTech 2025
25-11-2024

Visit InfraTech 2025

InfraTech 2025 will take place from 14 to 17 January 2025 at Rotterdam Ahoy. During InfraTech, infrastructure professionals join forces and share knowledge. The trade fair is the ultimate meeting place for clients, contractors, and suppliers in the infrastructure sector. You will connect with new and existing contacts, gain knowledge […]
To top