21-05-2024

Vroom headquarters made more sustainable

We are delighted to share that Vroom Funderingstechnieken continues to take significant steps towards sustainability. This time, we focus on our headquarters in Oosthuizen.

For Vroom, investing in and keeping up with developments regarding ‘clean’ engines and reducing (diesel) emissions is nothing new. Since the implementation of the TIER (US) and EU Stage regulations for diesel engines, these standards have always been adhered to. Over the years, significant investments have been made in acquiring new equipment that always meets the latest technological standards. But we do not only invest in the sustainability of our equipment; we also invest in a more sustainable world on other fronts.

[text continues below the photos]

Solar panels

Our headquarters is now equipped with solar panels, allowing us to generate our own green energy, resulting in a better ecological footprint.

High-performance glass

We have replaced all our windows with new high-performance glass. This means better insulation, reduced energy consumption and a more comfortable working environment for our team.

Roof insulation

Additionally, we have replaced the roof insulation, contributing to a significant improvement in the energy efficiency of our building. This ensures better heat retention and further reduction in our energy consumption.

High-efficiency++ boilers

We have also replaced our central heating system with high-efficiency++ boilers. This greatly enhances the efficiency of our heating and reduces our gas consumption.

Clean and fresh

And as if that wasn’t enough, we have had our headquarters thoroughly cleaned. The result? A fresh, clean and sparkling office where we enjoy working!

Share article:

More posts

Vroom Dimensioning Service: precision work down to the millimetre
25-10-2026

Vroom Dimensioning Service: precision work down to the millimetre

Precision is essential in foundation engineering. That is why we have this expertise in-house with Vroom Meetdienst. Our surveying engineers ensure that every project is accurately set out from the very first stage. Using advanced surveying equipment, they translate digital designs into precise measurements on site. From surveying anchor bolt […]
Vroom shares knowledge on AI in the foundation engineering industry
Foto: Kai Abresch
17-10-2026

Vroom shares knowledge on AI in the foundation engineering industry

On 24 and 25 September, Vroom delivered a presentation to the EFFC Task Group AI during the Baugrundtagung in Leipzig. The presentation focused on the application of artificial intelligence within the foundation engineering industry. The presentation addressed both the challenges facing the industry and the opportunities offered by AI. One […]
Solid and sustainable foundation for factory expansion
17-09-2026

Solid and sustainable foundation for factory expansion

Vroom Funderingstechnieken has completed the foundation works for the expansion of a factory in Groningen. This expansion represents a substantial investment in a future-proof production facility, with a strong focus on climate and environmental improvements. For the foundation works, Vroom installed DPA-combi screw piles using the Hillcon HSCX700GLS. In addition […]
To top