07-12-2024

Holidays

Vroom Funderingstechnieken and Vroom Betonbouw will be closed from 23 December 2024 to 7 January 2025. This period of rest and recovery is an important moment for the team to enjoy the holidays with family and friends.

Continuous development and training

After the holidays, Vroom will begin the annual collective training days on 6 and 7 January 2025. These days focus on enhancing knowledge and skills within our team, covering topics such as safety, digital skills, and job-specific training.

Limited availability

During this period, Vroom will be limitedly reachable by phone. Regular business operations will resume on Wednesday, 8 January 2025, when we will be ready to start the new year with fresh energy and a well-filled order portfolio.

Vroom wishes everyone a Merry Christmas and a prosperous 2025!

Holidays
Holidays

Share article:

More posts

BAUMA 2025: inspiration, innovation and connection
18-04-2025

BAUMA 2025: inspiration, innovation and connection

On Friday 11 April, an enthusiastic group of colleagues from Vroom travelled together to Munich to attend BAUMA, the leading trade fair for construction and foundation technology. After arriving early on Saturday morning, we kicked off the day with a hearty breakfast, after which we headed to the exhibition full […]
Hitachi CX900-GLS restored to peak condition
08-04-2025

Hitachi CX900-GLS restored to peak condition

After nearly eleven months of work in the Van den Heuvel workshop in Werkendam, it’s back. And better than ever. Commissioned by Vroom Funderingstechnieken, Van den Heuvel carried out a thorough overhaul and engine replacement on the Hitachi CX900-GLS. The result: an impressive foundation rig, fully prepared for a new […]
Certification of pile systems DPA and DPA-PLUS
21-03-2025

Certification of pile systems DPA and DPA-PLUS

Vroom Funderingstechnieken and Van ‘t Hek have jointly certified the pile systems DPA and DPA-PLUS with a self-declaration in accordance with NPR 7201. This process took over two years and involved load tests in which test piles, equipped with extensometers, were loaded to failure. In addition, an expert committee appointed […]
To top