For the foundation, our chosen solution is the DPA pile system. DPA stands for Drilling Push Aside and is a ground-formed and ground-displacing screw pile system. There is only limited soil removal involved. The production process is low in vibrations, which is crucial, especially in this location, when working near adjacent structures sensitive to settlement and/or vibrations.
View the 3D animation of DPA screw piles here.
The energy-efficient building comprises 36 exclusive studios, apartments, split-level lofts, and penthouses, each with its own rooftop terrace. This structure is predominantly constructed using wooden columns in combination with prefabricated concrete floors, representing not only an innovative approach to sustainability but also paying homage to the rich history of this location, once home to wooden work buildings.