Complex foundation for circular redevelopment

122 piles1.4 million kilos CO2 reductionExisting shell

Within the existing shell of The Bridge, Vroom Funderingstechnieken delivered a complex foundation. With well-considered solutions and an innovative approach, we provided a safe and reliable base for this circular project.

At this location, directly next to Utrecht University, Vroom Funderingstechnieken successfully realised a technically challenging foundation project in close cooperation with client BAM Nederland. A project in which safety, expertise and solution-oriented working were central.

During the preliminary phase, the focus was initially on applying our DPA screw piles. However, after extensive calculations and consultation, an alternative foundation solution was selected: the installation of DPA-PLUS screw piles, combined with a number of screwed steel tube piles. For the execution of these works, our subsidiary VDB Funderingstechnieken was deployed, enabling us to make optimum use of our combined knowledge and experience.

A particular challenge within this project was the fact that the existing building was largely retained. The original frame remained in place, which placed high demands on execution and required precision, craftsmanship and a well-considered approach. A complexity from which Vroom does not step back. Through good and continuous consultation with BAM, we jointly ensured a safe and flawless execution.

Logistically, this project also required an innovative approach. With our foundation machine, we drove through the existing frame, while raising the mast of the machine during movement. Thanks to this working method, we were able to safely reach the courtyard and efficiently install the foundation piles there, without compromising safety or quality.

A project that clearly demonstrates what Vroom stands for: committed collaboration, technical decisiveness and reliable solutions, even under the most challenging circumstances.

A circular icon for Utrecht University

The Bridge is a circular transition building at Utrecht Science Park, developed on the existing shell of the former Earth Sciences building. By reusing the concrete structure, more than 1.4 million kilos of CO₂ emissions are saved. An important step towards a sustainable campus. The building of approximately 20,000 m² provides temporary accommodation for various research institutes of Utrecht University during the renovation of the Kruyt Building. In this way, The Bridge contributes to a future-proof campus where innovation, knowledge sharing and sustainability take centre stage.

A circular icon for Utrecht University

The Bridge is a circular transition building at Utrecht Science Park, developed on the existing shell of the former Earth Sciences building. By reusing the concrete structure, more than 1.4 million kilos of CO₂ emissions are saved. An important step towards a sustainable campus. The building of approximately 20,000 m² provides temporary accommodation for various research institutes of Utrecht University during the renovation of the Kruyt Building. In this way, The Bridge contributes to a future-proof campus where innovation, knowledge sharing and sustainability take centre stage.

Can we help you with your project?

We are happy to answer your questions! Would you like to know more about our projects, products and/or services? Please contact Ingmar Ruiter

Ingmar Ruiter

Share project:

Realization
23-03-2026 to 13-04-2026
Location
Utrecht
Client
Kadans Science Partner
Contractor
BAM Bouw en Techniek - Projecten
Architect
Cepezed