Panattoni Distribution Centre

20000 m2 9100 piles

Vroom Funderingstechnieken (Vroom Foundation Technology) is making vibrated and vibro-SD piles for the Panattoni Distribution Centre on the Vlasweg in Moerdijk.

Given the ground structure on site and the nature of the buildings, this project is highly suited to pile-based foundations. A report recommended foundations with vibrated piles and developed plans for this in greater detail. The recommendation for vibrated piles is due, on the one hand, to the depth of the load-bearing foundation strata (hence the length of the piles), and on the other hand due to the potential flexibility in pile length.

The flexibility in pile length during the implementation phase is one of the advantages of using vibrated piles, as the soil structure is relatively heterogeneous, so the pile lengths may vary locally quite substantially.

Watch our 3D animation on vibrated piles here

Watch our 3D animation on vibro-SD piles here

Logistics hub

The port at Moerdijk is an important logistics hub due to its strategic location between Rotterdam and Antwerp, and the multi-modal network that converges here.

The new development, with a surface area of over 20,000 m2, is made up of a hall of 18,000 m2, 500 m2 of office space and a 1,700 m2 mezzanine floor. The complex will have 18 loading docks and 1 overhead door and the land on which it stands will offer parking for 165 vehicles. The distribution centre is scheduled for completion in the second quarter of 2022.

Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre
Panattoni Distribution Centre

Logistics hub

The port at Moerdijk is an important logistics hub due to its strategic location between Rotterdam and Antwerp, and the multi-modal network that converges here.

The new development, with a surface area of over 20,000 m2, is made up of a hall of 18,000 m2, 500 m2 of office space and a 1,700 m2 mezzanine floor. The complex will have 18 loading docks and 1 overhead door and the land on which it stands will offer parking for 165 vehicles. The distribution centre is scheduled for completion in the second quarter of 2022.

Can we help you with your project?

We are happy to answer your questions! Would you like to know more about our projects, products and/or services? Please contact Rob Sman

Rob Sman

Share project:

Realization
20-09-2021 to 12-11-2021
Location
Moerdijk
Client
Goldbeck Nederland B.V.
Contractor
B. Schipper Apeldoorn B.V.
Architect
Panattoni Europe
 
Leon Klaassen
Project Manager