Foundations and floors

Vroom Funderingstechnieken (Vroom Foundations Technology) is a specialist in managing and completing projects involving pre-fab concrete products: foundation beams, lay-down areas, lift pits, hollow-core slab floors, retaining walls, ribbed slab floors, cellars, foundation blocks and base boards. The pre-fab concrete products are designed, produced and supplied by Vroom, and are KOMO-KIWA certified. Vroom also carries out conventional concrete work for foundation structures and foundation repair. When laying foundations for public utilities, Vroom also produces floor areas. Vibrated SD piles are inserted into the ground close together to create a ‘nail bed’. To do this, we make a complete design in which these piles work together with the floor in the best way possible. This gives the floor a solid foundation.

130 dwellings, Hoef en Haag project
Foundations and floors, Residential construction

130 dwellings, Hoef en Haag project

Vroom Foundation Technology is installing pre-cast piles for 130 dwellings at the Hoef en Haag project on the Lekstraat in Vianen (Utrecht) and assembling pre-cast foundation beams and foundation slabs.
New construction in the Kuyperwijk
Foundations and floors, Residential construction

New construction in the Kuyperwijk

2021 will see the advent of new houses and apartments in the Van der Goesstraat and the Van Schuijlenburchstraat in Delft. Vroom will be providing the foundations for this using a range of pile systems, and will be placing pre-cast foundation elements.
34 dwellings, Westend
Foundations and floors, Residential construction

34 dwellings, Westend

Heembouw and Kennemerland Beheer (KB) are developing the planned “West-End” area for use as a residential area. The aim is to create an exceptionally sustainable neighbourhood. Gas-free, in part zero meter use (ZMU) dwellings and otherwise ‘very energy-efficient’ homes. We give these dwellings a complete foundation package, which is made up of driven piles, foundation beams, foundation blocks and lay-down areas.
84 dwellings, Park Centraal
Foundations and floors, Residential construction

84 dwellings, Park Centraal

It's a great number to start with, because the Park Centraal project will ultimately have 365 dwellings. This is part of the hard work involved in resolving the housing shortage in the Netherlands. In response to a development by AM, BAM Wonen is building dwellings from its residential collection here. We are currently engaged in the construction of 84 dwellings for phase 5.
105 dwellings, Hof van Bilthoven
Foundations and floors, Residential construction

105 dwellings, Hof van Bilthoven

In Bilthoven we have started laying the foundations for 72 owner-occupied homes and 33 social-housing homes as part of a project managed by master contractor ERA Contour, part of the TBI Group. A nice number of dwellings, which makes the project ideal for the use of pre-cast concrete. The pre-cast elements are delivered to the site and installed accordingly.
64 dwellings, Hoef en Haag
Foundations and floors, Residential construction

64 dwellings, Hoef en Haag

In Vianen a start has been made on construction of 64 energy-neutral dwellings that are not dependent on natural gas in the Hoef en Haag development. For a standard household the energy generated sustainably is equal to the amount used. A large section is being built on the canal or on the Meander, the new watercourse to be built, over which some of the development will look.
Vrijzicht – 14 apartments
Foundations and floors, Residential construction

Vrijzicht – 14 apartments

Vrijzicht 2 is being built around the corner from the Klokhuis building in Almere. The buildings’ foundations are formed with vibrated HBF-type piles. On top of this comes pre-fab foundations that we designed, delivered and installed. This type of foundation makes shorter building time and increased standards of building possible.
61 homes De Krijgsman Muiden
Foundations and floors

61 homes De Krijgsman Muiden

On the former powder mill site in Muiden, a special residential area is being realized: De Krijgsman Muiden. Ufkes Apeldoorn is realizing 61 homes and 24 apartments for which Vroom is applying prefab foundation piles and foundation beams.
45 homes Helsdingen
Foundations and floors, Residential construction

45 homes Helsdingen

In Vianen, the foundation has been laid for another 45 homes for the Helsdingen plan right next to the A2 freeway. This is a continuation after the construction of 50 homes built in an earlier stage. The project is being realized by Ballast Nedam West.
Oostpoort stage 3
Foundations and floors, Residential construction

Oostpoort stage 3

On the Amsterdam Polderweg, 397 vibro piles have been inserted and 10 prefab shed floors have been placed in the inner garden for the third stage of the Oostpoort project.
74 homes in Nieuw Rhijngeest
Foundations and floors, Residential construction

74 homes in Nieuw Rhijngeest

The new Oegstgeest neighbourhood Nieuw Rhijngeest will ultimately include 1,100 homes. We will be involved with the construction of 74 town houses. The neighbourhood is located between the Oude Rijn river and the A44 freeway near Leiden.
35 De Wende homes
Foundations and floors, Residential construction

35 De Wende homes

We have taken care of the complete image for 35 homes on the edge of Heerhugowaard including the piling process of prefab piles and the delivery and application process of prefab foundation beams and shed floors.
To top