Infrastructure
Energy, Infrastructure, Public utilities, Residential construction
Kwadijkerpark sheltered accommodation
In recent years, there has been significant expansion at Kwadijkerpark: the healthcare institution is undertaking considerable new construction. This time, three new buildings are being positioned on Flevostraat and at Noordpunt. Time for us to drive 640 piles into the ground.
Infrastructure
Noise barriers on the A1 and A27
In a prime location between the A1 and the A27, Vroom has worked on the foundations for noise barriers in a 10-stage process. Three of our rigs could be spotted regularly on the section between Utrecht-Noord and Bunschoten-Spakenburg, near the Eemnes junction between the A1 and the A27, from the end of July 2017.
Infrastructure, Public utilities
Tram depot
A new working place functioning as the key location for tram maintenance. For this purpose, Vroom has applied 368 VGS piles with grout injection. The trams that will be maintained on this working place will travel not only through Utrecht, but also through Nieuwegein and IJsselstein in 2020.
Infrastructure, Public utilities
Tram depot for RET
A few months ago, the 100-year-old depot was still there, these days we have started the piling activities for the new depot on this spot. The old depot had to disappear because the building no longer met the most recent requirements. For example, some vehicles were too long for maintenance inside the building.
Infrastructure
Traverse on N31 in Harlingen
The N31 in Harlingen will be broadened over a distance of approximately 3 km and will be upgraded from a two-lane road to a four-lane one. Around 2 km of the road will be constructed in an in-depth part of the road and for that purpose, Vroom has inserted prefab piles.
Infrastructure
Noise barriers on Westfrisiaweg
We are working hard alongside the N23. Vroom is applying CFA piles with mortar for the construction of noise barriers and portals. The ramps and exits will be shut down and in order to limit any inconvenience for drivers, we will carry out the greater part of the activities by night.
Infrastructure
R4 Oost crossroad
For a new crossroad for the R4 Oost connection to Langerbruggestraat in Oostakker, partly in the municipality of Gent, we have started the piling activities. The current crossroad will be replaced by a rotunda. The activities are being carried out next to the current train track.
Infrastructure
Noise barriers on A7 freeway near Scharwoude
Hard work is beingdone for the upgrade of the N23 freeway. The 42 km route travels from Heerhugowaard to Enkhuizen and connects on two junctions to the A7 freeway near Hoorn. For noise barriers near Scharwoude, we have drilled CFA piles with mortar.
Market segment
Show on map