Energy

Energy, Infrastructure, Public utilities, Residential construction
Kwadijkerpark sheltered accommodation
In recent years, there has been significant expansion at Kwadijkerpark: the healthcare institution is undertaking considerable new construction. This time, three new buildings are being positioned on Flevostraat and at Noordpunt. Time for us to drive 640 piles into the ground.

Energy
‘Green Biddinghuizen’ wind-power project
In the environs of Biddinghuizen, we are making the foundations for 45 wind turbines with vibrated piles. The fact that the foundations for a 'modern-day windmill’ are so important is pretty self-explanatory. Nonetheless, we'd like to explain what the reason for this is, and what goes into the whole process.

Energy
Westerse Polder wind farm
We have installed 200 vibrated piles with our largest pile-driving rig, the CX1100 GLS. The foundations we have laid will support five large, modern wind turbines that will supply 20,000 households with 'green’ energy. The wonderful landscape and the almost endless panorama make for great photos.

Energy
Windmill park in Beersel canal area
In the canal area on the border of Beersel and Sint-Pieter-Leeuw, 5 windmills are being placed. For the foundation of the mills, Vroom International Piling has applied the VGS piles. The production process of the piles takes place on-site, completely with a low vibration and a low sound level, and grout has been poured in-situ.

Energy, Renovation and expansion
380kV substation Beverwijk
For the expansion of the TenneT substation in Beverwijk, more than 600 heavy prefab piles and 185 steel tubular piles have been driven. Also, 22 steel tubular piles with a low vibration level have been drilled directly next to the current station. The steel tubular piles have been produced on a limited height because of the presence of the current transmission tower.

Energy
Windmill park on Albertkanaal’s right bank
Limburg Win(d)t will get a second windmill, this time on Albertkanaal’s right bank on the Genk Zuid business park. For this windmill which is located just over the Belgium border, we have applied the foundation piles with low-vibration levels. The windmill with a foundation system realized by H4A will be operational in 2015.